$10,000 - $50,000 with me doing most of the labor
14 (11%)
$50,000 - $75,000 with me doing most if the labor
3 (2%)
$75,000 - $100,000 with me doing most of the labor
4 (3%)
$100,000 -$150,000 with me doing most of the labor
7 (5%)
$150,000 - $200,000 with me doing most of the labor
4 (3%)
$200,000 + with me doing most of the labor
13 (11%)
As cheap as possible! I'm using local materials, factory seconds, and anything I can find that's cheap or free...
9 (7%)
Less than $100,000 and I'll be using a contractor
2 (1%)
$100,000 - $200,000 and I'll be using a contractor
6 (5%)
$200,000 - $300,000 and I'll be using a contractor
7 (5%)
$300,000 + with a contractor
49 (41%)
Votes so far: 118
No comments:
Post a Comment